top of page
Langtree_White inline no tagline.png

Trap Gully Overland Water Flow

Batchfire Callide Mine

Batchfire Callide engaged Langtree Consulting to deliver the Overland Water Flow Management of Trap Gully to protect the future coal pits from the inundation of flood waters. As part of these works Langtree Consulting have designed an overland flow path (open drain), retention basins and culverts based on 2D flood modelling to ensure that the future pits have at least a 1 in 100-year immunity. Langtree Consulting also assisted Batchfire Callide with the Tender Process whilst investigating the option of replacing the overland flow path with a levee to reduce the cost of the project.

Colour Full Inline Logo Langtree..png

At LANGTREE CONSULTING ENGINEERS we are passionate about having a positive impact on our region and our communities. 

Quick Links

Home

About us
Services
Projects

Careers
Contacts

  • Instagram
  • Facebook
  • Twitter
  • LinkedIn
  • YouTube
  • TikTok

Head Office

Contact Us

Level 1 14 Ingham Road West End Townsville QLD 4810

Phone:

07 4724 2546

Email:

bottom of page